If you’re outfitting a compact fashion space, the Display Fixtures Store Decoration Shopfitting Small Boutique Garment Store Furniture Clothes Shop Interior Design Shop Fitting package has been doing the rounds in buyer chats lately. I walked a few installs, ran my hands along the powder coat, and—honestly—this kit looks purpose-built for small footprints where every shelf has to sell.
| Frame | Cold-rolled steel (≈Q235), TIG-welded, powder coat 70–90 μm |
| Shelves/Surfaces | E1 MDF with UV lacquer or veneer; tempered glass options |
| Load Capacity | ≈120 kg per shelf (real-world use may vary; tested static) |
| Lighting | Integrated LED, 3000K/4000K, CRI ≥90; CE/UL-compliant drivers |
| Finish Options | Matte black, sand white, brass-tone PVD, oak/walnut veneer |
| Service Life | ≈5–8 years with quarterly maintenance |
| Warranty | 12–24 months (project-dependent) |
Typical workflow: brief and site survey → 3D concept → engineering drawings → prototype → mass production (CNC routing, precision welding, electrostatic powder coating) → QA → flat-pack → on-site install. QA notes: load tests to EN 16121/16122 Level 2, hardware salt-spray ≈72 h (ASTM B117), finish abrasion per ISO 1518, LED drivers CE/UL, boards E1 emissions, and occasional ASTM E84 flame testing for wall panels (Class B where specified). It sounds dry, but these numbers save you rework later.
Small garment boutiques, department-store corners, pop-ups, and travel retail. Advantages? Fast planogram changes, cable-managed lighting, sturdy rails that don’t flex, and a finish that hides fingerprints. Many customers say setup time is “surprisingly short”—I’ve seen a 35 m² shop reset in one evening.
| Vendor | Materials | Lead Time | Certs | Customization | Price Index | Warranty |
|---|---|---|---|---|---|---|
| CH Shop Display | Steel + E1 MDF, LED, PVD | 25–35 days | ISO 9001, CE/UL, FSC option | High (ODM/OEM) | $$ | 12–24 mo |
| Local Joinery A | Timber focus | 14–20 days | FSC, local codes | Medium | $$$ | 12 mo |
| Importer B | Mixed grade | 35–55 days | Basic CE | Low | $ | 6–12 mo |
Dimensions, colorways, veneer species, bracket pitch, branding plates, and knock-down vs. welded frames—pick your poison. Installers get pre-marked anchors, concealed leveling feet, and simple hardware bags. Real-world note: two techs can assemble a three-bay run in ≈3–4 hours with a cordless set.
One manager told me, “We finally have fixtures that make skinny aisles feel premium.” That’s the game.
Origin: 26F., Shangde Plaza No.8 Kangle Street Shijiazhuang China. For repeat orders, reference Display Fixtures Store Decoration Shopfitting Small Boutique Garment Store Furniture Clothes Shop Interior Design Shop Fitting and specify finish codes up front. Also, yes, spares for glass and LED strips are available—smart to stock a few.
Certifications available on request: ISO 9001 QC system, CE/UL lighting, FSC wood options. Compliance targets: EN 16121/16122 for non-domestic storage, E1 emissions for boards, and ASTM E84 where required by local code.